Showing posts with label cardigan. Show all posts
Showing posts with label cardigan. Show all posts

Monday, January 31, 2011

Prime Time 2011 - Jan

This is my blue cardigan. It was finished by Friday. Back from the weekend, I made a quick pic to post the finished cardigan. It is very warm and I will be happy if I find some yarn to fix the buttons once more with a second small button on the inside. Then maybe a better pic will follow.

Monday, January 24, 2011

PrimeTime 2011 Jan


Back is done, fronts are done, this is the first sleeve and yet another to be done. It is Jan 24, so hopefully the end of my PrimeTime will not be at the first possible stage. You all could know by now something about my size, a blend of some X and one L. We must not argue if I had 300yds/m to do this cardigan, but as in every year I went through my wardrobe and had to admit some spaces left for sensible garments. IF this reaches the "finished" tag for the PrimeTime 2011 KAL, the project coming for February will definitely be in a smaller range. A woman´s got to do what a woman´s got to do.

Sunday, June 6, 2010

Dog Days UFO

Cotton sweater

I started this project in June 2009. The body is 3-color seed stitch. I learned this technique in a Lily Chin class. The jacket is based on a Vogue sewing pattern and will eventually have lace on all edges.

Here's a close up of the fabric. I am using dishcloth cotton in variegated color I've had for years and years, off white, and sage green.

Thursday, December 31, 2009

End of 52 Week Challenge 09 - last objects finished

No KAL-socks, because I missed to take a pic of the unfinished socks. These were a gift for a friend and she likes them.


Qualifying for a second project for December: This is my cardigan, finished right before Christmas and very welcome, as it was very very cold. We definitely had white christmas.

Here is a detail from the band and how it is sewn to the front. Shape was made with the help of short rows.
There is only one object missing that I did not finish this year. It is the green cardi with the asymmetric closure and the square neck. All I have to do is the seaming of the sleeves. But I cannot find the cardi. Within the last two weeks I re-organised my stash. My big stash. My giant stash. Now I know where each and every yarn is, but where did I put that green cardi ?
All the best to all of you for 2010!
AND: Thank you for offering this KAL. I will go for it again in 2010.

Thursday, June 18, 2009

Thursday, April 30, 2009

52 Weeks KAL-April Projects and New Beginnings

Finally finished and qualifying for April is the cardigan out of yak/merino yarn. Not yet embroidered as planned, because I think it is beautiful now and embellishing can wait for another cardigan.
Here is the proof of two sleeves and room for my global shape.

Bertie socks for my husband. Ordered.

New playful design for some daughter. Not ordered :-)



New sweater for summer, cotton mix, initials will make a clear statement of owner-to-be :-)
This KAL is good for me! I would never have gone for finishing that cardigan as it seemed endless to knit and to sew. Now I am so happy.




Saturday, March 28, 2009

Update March project, progress pics

The Beauty and the Twist are finished. Maggie Bag was first half of March project. Now there are another 380 yards of fingering weight sock yarn. March is done!
Long time TV knitting project, started this month, but not finished and no good stockinette stitch before washing for me... This will become a square neck cardigan, closed on left side, 3/4 sleeves and long enough to hide important parts of my wonderbody.

Another long time project, started in February ( or even in January?), cardigan, classic style, but will be embroidered after knitting. Hope to finish this as my April object. Yards enough. More than.


Saturday, January 31, 2009

New project, progress, plans, dreams

Here is a better picture of the red socks´s pattern:
Then I have begun a new project, a long cardigan out of yak and merino, which will have some embroidered elements and probably will show a crocheted closure. But from that I am weeks away. It is knit on 3mm circs and has a width of about 58", length 32". The result of three days and nights is here:
It will be my project for February, hopefully.
At last, I thought about this KAL to be a 52 week challenge that should help to get accomplished some of those longlasting dreams. That is why I will cast on for one of my old favourites, the Frost Flowers and Leaves Shawl from Eugen Beugler.
If I show some threads, would you help me with deciding on colour and fiber?
I have some dark blue silk, some dark bluegreen lace from Uruguay and a dark purple cashmere laceweight and a stone grey raw silk and would like to have some help with the decision because this will be a long time project, perhaps not ending before the end of this KAL.