Showing posts with label cpy 2010/2. Show all posts
Showing posts with label cpy 2010/2. Show all posts

Monday, January 3, 2011

one last 2010 project

i started this in september for the holiday (or not) kal but didn't manage to finish it until december 31st! ok, i get easily distracted. what can i say? at least, i didn't have to try knitting a PAIR!!!

in the land of oz shawlette
mini mochi in neptuneLink

in the land of oz

in the land of oz shawl


i was hoping to have it blocked by now but that obviously has not happened. i am happy with the photos as this is the first time the colors have come out close to the richness of the colors in real life.

i did piece together the colors so the the stripes are wider in the lace section. i love making more work for myself! =P

will return with a picture of the blocked shawl after that happens.

Wednesday, December 1, 2010

12/12/12boy Nov


Hi everyone. Lost the camera in Katie's room last night. Here is my entry!
It is the Kentucky sock from the 50 Socks 50 States cd. I modified it a little for fit. Smaller needles 2.25mm, and decreased down by one more pattern repeat on the foot. The second one definately fits better than the first. I used CPY's Rose Musk colorways too. I like these very much. The only bummer is I kinda made the sweater that it goes with fuzzy. My Dh put it in the dryer. It is not bad enough to get rid of it but I propably won't wear it out of the house. I can not wait for Knit Night to show off the socks! yeah.

Tuesday, November 30, 2010

12/12/12 Carefree KAL - November







Finished my projects for this month. I used the Margarita Summer sock pattern by Denise Henderly from the 50 Socks - 50 States CD, Shibui yarn in the Pagoda colorway with CPY Kid Merino in Fall Herbs for reinforcement and size 2 square dpn. Also moved this month! The pattern was really fun but I wish the top didn't turn down...errrr. Hopefully that won't be an issue when I am wearing them.

I also knit a scarf using Crystal Palace Choo Choo yarn in Rose and Charcoal. Hope it is OK I am posting both the wip and finished picture - it was an afterthought project in case the sock yardage was on the short side.




Sunday, November 28, 2010

November project

Hi all!

I thought I'd share another project that I knit with CPY yarn this year.

Here's a progress pic:
10.10.10 006

And the finished socks:
11.18.10 001

Pattern: Through The Loops Mystery Sock 2010
Cast on: 10/1/10
Finished: 11/18/10
Yarn: Panda Cotton - Coral Sea
Needles: US1 magic loop
Estimated yardage: 300 yards

I'll also share a close-up of the foot:
11.18.10 003

I was afraid this yarn might be too busy for the pattern because she recommended a solid or semi-solid, but I LOVE how these turned out. These will be a Christmas gift for my mom, so I hope they fit her.

-Cathy (n3tue)

Sunday, November 21, 2010

12m/12p/12boy - November 2010 Completed - Brenda (Owlsrook)



November 2010 completed Project - Menehune Socks in Crystal Palace "Panda Wool", colour is "Periwinkle". 6 inch cuffs, Ladies Medium - 66 Stitches, 2.25 mm circurlar needles. Estimated completed yardage 340 yards. I love everything about this particular yarn, and Menehune is one of my favorite patterns to knit.
Thank you to Adrienne for designing it. Posted both in progress and completed photos
(in progress was posted earlier this month).

Friday, October 15, 2010

October Finishes

One of Crystal Palace's new colorways. This is Bodega Bay, Mochi Plus. I think it works up very well in entralac. Love how this turned out.


With the left overs I made Laura Andersson's Topsy-Turvy Cowl.


Wednesday, October 13, 2010

12m/12p/12boy - Oct. 2010 Complete- Brenda (Owlsrook)





October Project Completed - Mini Mochi Gift Set (ruffled garter stitch neckwarmer, ribbed and seed stitch hand warmers, matching gift ruffled gift bag). Completed photo of set, and progress photos are attached. This took 2 50gram balls of Mini Mochi Color #114 - Blooming. I had just over 6 yards of yarn left over. so estimated total yardage for the set = 384 yards. These are my own pattern designs.

All were knit on a size 3.25 mm circular needle. Although the gift bag looks smaller in the photo, when opened up, it has a 3.5 inch square bottom, and expands to hold the neckwarmer and hand warmers.

Brenda in Alberta
(Owlsrook)

Sunday, September 12, 2010

12/12/12boy september







Here is my September entry. Viva Las Vegas (wiggled.) I am so excited to have my first stranded, afterthought heel, gifted (and unfortunately modified for dress code) socks!
But I love them. I like that depending on how she wears them all of the suits (is that right?) show. Dang I do not wanna give them up, I worked so hard on them. But, I am going to make her mittens next! So, they are more show-offable!
Pattern- Viva Las Vegas
Needles- 2.5mm
Yarn- Panda Cotton
Date started-July 10th
Date finished- last night!
Darn, late for church but had to post. Off to play with Adrienne's Mystery sock!!!!!!!! Yeah.

Thursday, September 9, 2010

12m/12p/12boy -September 2010 Completed- Brenda (Owlsrook)


September 2010 Completed CPY Project - Wickerware Socks in Panda Cotton, Colour is Vanilla Cream - Given the amount of yarn left over (about 10 yards) I estimate total yardage about 350 yards for the pair. I really do like the feel of the Panda Cotton, it is very soft.

Brenda in Alberta

Tuesday, August 24, 2010

I'm still knitting!!

I just haven't been FINISHING much this year, and when I do finish I forget to post to this blog. But, I thought I would share my latest project knit with CPY yarn.

8.23.10 002

This was the July mystery sock for the Sock Knitters Anonymous group on Ravelry.

Here's a progress photo:
7.5.10 001

Details:
Pattern: July 2010 SKA mystery sock by Chrissy Gardiner (on Ravelry)
Yarn: Panda Soy in Sky Blue, Velvet Blue, and Evening Blues
Needles: US 1 magic loop
Yardage: 348 yards
Cast on: 7/3/10
Finished: 8/23/10


-cathy (n3tue)

Sunday, August 22, 2010

12m/12p/12boy - August 2010 Completed CPY Project - Brenda (Owlsrook)



Completed Grape Vine Lace Scarf - knitted with 325 yards of Crystal Palace Panda Wool in Strawberry. Also a photo again of the in progress picture that I originally posted on Aug 4/10. This is a gift for my Grand Daughter Meaghan.

Regards,
Brenda in Alberta

Sunday, August 1, 2010

July 12/12/12

Argosy scarf finished July 15th (start July 9th). Used all of 3 balls of mini mochi = 585yds, hook 5.0 mm (H).









Also knit a very stretchy hat for my son (that also fits me). Used all of 1 skein cascade yarns sassy stripes, 218yds, needles US 1½ (2.5 mm). Start July 24th, finished July 29th. These two are not a set, just what I actually finished :)

Saturday, July 31, 2010

July 2010 Carefree 12/12/12 KAL


Well, I finished with a little time to spare - a moment of panic when the camera didn't want to cooperate! My socks this month are made with Crystal Palace Panda Soy yarn in the Provence colorway. I used the Sultry Lace Sock pattern by Debbie Haymark from the 50 Socks -50 States CD. The needles I used were size 1 square dpn. I had to redo the pattern a little by removing several repeats (my first sock screw-up turned into a little drawstring bag). The beads add a little bling to the top of the socks. Now I am on to the finishing touches on the Dog Days KAL...

Thursday, July 8, 2010

12m/12p/12boy - July 2010 Completed - Brenda (Owlsrook)



July 8/10 - completed project for July - Lace Shawl - Started July 1/10, Using mini mochi - estimated 385 yards - using a size 3.5mm circular needle. I only modified this pattern by adding and extra repeat in each section, and deciding I liked the Eyelet edging instead of the Picot edging used in the pattern. This was a fun and very quick knit. (Progress picture was posted last week).

Brenda in Alberta
Owlsrook on Ravelry

Sunday, July 4, 2010

12/12/12 July 4th socks for Fred



I didn't finish these in time for his birthday due to a massive brain fade mistake of skipping the heel turn and going directly to the gusset section. I was shocked when I realized the error (after thinking the sock was funny looking and decreasing most of the picked up sts) and had to frog back to the top of the heel flap and do the turn. I had been knitting in the middle of the night to finish on time and did finish a few minutes ago which is still July 4th "up over" and July 5th here down under.
I used 2 full skeins of Crystal Palace Panda cotton in delft blue and 25 gms of the red ketchup skein + a bit of cream. At least he will be able to wear them mid-July when he teaches in the tropics in Darwin. :) Thuja pattern for the cuff and plain stockinette below the ankles.